(Новая страница: «'''Critical path''' --- критический путь. An important parameter in any ''PERT'' digraph is the length of the longest path from the start to the ter…»)
 
Нет описания правки
 
Строка 1: Строка 1:
'''Critical path''' --- критический путь.  
'''Critical path''' — ''[[критический путь]].''


An important parameter in any ''PERT'' digraph is the length of the
An important parameter in any ''PERT'' digraph is the length of the longest [[path]] from the start to the termination [[vertex]]. Such a path is called a '''critical path''', and its length represents the shortest time within which the overall task can be completed. For this reason the analysis is sometimes called '''CPM ([[Critical path method]])'''.
longest path from the start to the termination vertex. Such a path is
 
called a '''critical path''', and its length represents the shortest
==Литература==
time within which the overall task can be completed. For this reason
 
the analysis is sometimes called '''CPM (Critical path method)'''.
* Евстигнеев В.А., Касьянов В.Н. Словарь по графам в информатике. — Новосибирск: Сибирское Научное Издательство, 2009.

Текущая версия от 12:03, 22 февраля 2018

Critical pathкритический путь.

An important parameter in any PERT digraph is the length of the longest path from the start to the termination vertex. Such a path is called a critical path, and its length represents the shortest time within which the overall task can be completed. For this reason the analysis is sometimes called CPM (Critical path method).

Литература

  • Евстигнеев В.А., Касьянов В.Н. Словарь по графам в информатике. — Новосибирск: Сибирское Научное Издательство, 2009.