Critical path
Перейти к навигации
Перейти к поиску
Critical path --- критический путь.
An important parameter in any PERT digraph is the length of the longest path from the start to the termination vertex. Such a path is called a critical path, and its length represents the shortest time within which the overall task can be completed. For this reason the analysis is sometimes called CPM (Critical path method).